The part

Drawing to PPAP.

One part, one file, in the order the work is done.

  • PPAP Set-up

    The elements this customer asks for

  • Component Definition

    The drawing read, every limit ballooned

  • Up-issues

    What changed, found; the rest carried over

  • Parts List

    Assemblies, read off the drawing

  • DFMEA

    Design risk, before the route

  • CI & KC

    What the definition commits you to

  • Process Flow Diagram

    Steps from your work centres

  • PFMEA

    Drafted from your library, yours to rate

  • Control Plan

    Derived from the PFMEA

  • MSA

    Gauge R&R, run and calculated

  • Capacity Assessment

    Can the route make the rate

  • Packaging

    How the part ships

  • FAI

    Full or partial, every characteristic

  • Capability

    Control chart, Cpk and Ppk

  • Results

    DPU and right first time

  • PSW

    Signed, and the pack downloaded

APQP

Five gates.
One tracker.

Each new part, product or change, from enquiry to launch.

  • Launches

    One per new part or change

  • Enquiry

    The customer's documents, read for you

  • Phases

    A gate passes when its work is done

  • Sign-off

    The lead signs; open tasks become risks

  • Dashboard

    Every launch against its plan

  • Lessons

    What each launch taught, offered to the next

  • Roles

    Who holds which launch role

  • Past projects

    Old plans brought in and checked

Switched on per company · Ask on the demo

Manufacturing

Made, inspected, traced.

The control plan, run on the floor.

  • Work Orders

    Serial by serial, to Excel and back

  • Inspection

    On a tablet, the verdict before it saves

  • Work in Progress

    Where every order is

  • Process Control

    Hold a process with no PPAP

  • NCR and 8D

    Raised beside the fail, worked on a phone

  • 8D tools

    Is / Is not, fishbone, 5 whys

  • 8D assistant

    Suggests causes; a person decides

  • SOP Library

    Steps, what breaks them, the pictures

Operations

The shop
behind the part.

Set up once, used by every part.

  • Work Centres

    Machines, gauges, stations, subcontract

  • Calibration

    A lapsed gauge cannot pass a part

  • Machinery

    Downtime, reliability, maintenance

  • Machine capability

    Each machine, studied and charted

  • MFMEA

    How the machine fails

  • IFMEA

    How the measurement fails

  • Reference PFMEAs

    Your PFMEA for each process, rated once

  • Your own processes

    Add one; its library drafted for you

  • Customers

    Who the parts are for, what they impose

  • Suppliers

    What each is approved for

  • People

    Who may do what, who is qualified

  • Access Record

    Who changed what about access

  • Sign in with
    Microsoft or Google
  • Two-factor where
    the role needs it
  • Your data
    stays in the UK
  • Every change
    is recorded
  • Download
    everything